Ⅴ. 课文语法填空
Ireland has
a
long history of producing great writers and poets. Its beautiful countryside excites and
inspires
(inspire) all, offering something for each of the senses. The peaceful landscape of the “Emerald Isle” and its many green counties is a true feast for the eyes, with its rolling green hills
dotted
(dot) with sheep and cattle. And down by the sea, the roar of the ocean waves and
cries
(cry) of the seabirds make up the music of the coast.
On
a quiet morning in the mountains, feel the sun on your skin, and breathe in the sweet scent of fresh flowers while birds greet the new day with their morning song. With all this beauty, it is not surprising
that
Ireland has developed strong traditions that include music, dancing, and dining.
To have
(have) a chance of experiencing this, stop by a village pub and relax with a glass of wine or a local beer.
Better
(good) yet, enjoy a delicious traditional Irish Beef Stew. If you’re
lucky
(luck), you might be able to enjoy some traditional music and dancing, too. And if you introduce
yourself
(you) to a friendly face, you are more than likely to experience local culture and customs first-hand.
答案: 1. a 2. inspires 3. dotted 4. cries 5. On 6. that 7. To have 8. Better 9. lucky 10. yourself
Ⅵ. (2024·四川成都期末)阅读理解
The Gezhouba Dam is the world’s largest run-of-river hydropower(水力发电) station and the first large water control project in the Yangtze River. It celebrated the 43rd anniversary(周年纪念) of its functioning in 2024. Since its functioning, nearly 600 billion kilowatt-hours of electricity has been produced in total. It is the largest water protection project independently designed, constructed and operated by China in the 20th century.
From the start of construction in 1970 to the functioning of the first generator unit in 1981, to the completion of the whole project in December 1988, more than 100,000 hydropower specialists from all over the country, who set up the base in the wilderness, carrying poles and pushing carts to overcome a series of significant technical problems, finally completed all the construction tasks with their blood and sweat.
Since its completion, the Gezhouba Dam has safely released more than 60 floods equal to 45,000 cubic metres per second on the Yangtze River, effectively reducing the pressure of downstream flood control operations and helping to protect the lives and belongings of people in the middle and lower reaches of the Yangtze River.
“The successful construction and management of the Gezhouba Dam has provided valuable experience and played a role in training talent for the design, construction and operation of the Three Gorges Project and other super dams. Practice has proved that the Chinese are able to build and manage large water projects on the Yangtze River,” Xiang Ke, deputy director of the Gezhouba Hydropower Plant, said. “A new chapter of hydropower development for the Chinese people begins with the Gezhouba Dam, and we will continue our efforts to contribute to a brighter future in this field.”
1. How long did the construction of the Gezhouba Dam take?
A. 7 years.
B. 11 years.
C. 18 years.
D. 43 years.
2. What is introduced about the Gezhouba Dam in the last paragraph?
A. The process of building it.
B. The way to operate it.
C. The reasons for constructing it.
D. The significance it has produced.
3. What is the purpose of the text?
A. To introduce a famous hydropower station.
B. To explain the function of the Dam.
C. To present China’s determination in flood control.
D. To stress the importance of water control projects.
答案: 1. C 2. D 3. A